17 October

Various357.jpg

Meeting of tracklayers from east and west, Trans-Australian Railway, Ooldea, South Australia, 17 October 1917. Photo: National Library of Australia, Bib ID 4366334.

Linking the west

 

Construction teams working on the Trans-Australian Railway (TAR) met on 17 October 1917.

 

The TAR links Kalgoorlie in Western Australia with Port Augusta in South Australia and has a length of 1691 km. It’s opening in 1917 connected the eastern states and Western Australia by rail for the first time and was a vital part of opening up the new nation.

 

Construction of the TAR had been promised as part of the agreement for Western Australia to join the federation of Australian states and territories in 1901. Work was finally authorised by Federal Parliament in December 1911.

 

Henry Deane was consulting engineer for the survey of the line and was appointed Engineer-in-Chief for the Commonwealth Railways on 1 January 1912. Deane was responsible for construction of the TAR, which included significant challenges in an almost waterless landscape that had few inhabitants.

 

The first sod was turned at Port Augusta on 14 September 1912 by Governor-General Lord Denman. Around 5000 people gathered to witness the ceremony. At the western end of the line the first sod was turned on 12 February 1913 by Prime Minister Andrew Fisher. Work was undertaken simultaneously from both ends of the railway.

 

Track workers used basic tools and horses to assist with construction. Around 2.5 million hardwood sleepers and 140,000 tons (142,247 tonnes) of rail were required. The two construction teams met near Ooldea, a distance of 995 km from Kalgoorlie and 697 km from Port Augusta, at 1.45 pm on 17 October 1917. In round figures the total cost of the line was £6,667,000.

 

A feature of the TAR is the longest straight section of railway line in the world, extending 478 kilometres.

 

Completion of the TAR finally provided a railway link from the east to Western Australia.

 

Read more

https://www.railtram.com.au/trans-australian-railway-1

 

Bibliography

D Burke, Road through the wilderness: the story of the transcontinental railway, the first great work of Australia’s federation, New South Wales

     University Press, Sydney, 1991.

‘Rail link that brought the nation together’, Track+Signal, vol. 21, no. 3, July–September 2017, pp 40–2.

‘The Trans-Australian Railway: national engineering landmark’, Engineers Australia, 2001,

     https://portal.engineersaustralia.org.au/system/files/engineering-heritage-australia/other-supporting-

     material/HRP.Trans%20Australian%20Railway.Booklet.Nov%202001.pdf, accessed 11 October 2026.

F Vogel, ‘Kalgoorlie to Port Augusta railway’, New South Wales Railway & Tramway Magazine, vol. 1, no. 1, December 1917, pp 5–7.

Various1388a Driving the last spike on the Trans-Australian Railway near Ooldea at 1.45 pm on 17 October 1917. Photo: National Archives of Australia, 8558590.

Various1388a.jpg
Various358.jpg

Camel trains used to carry supplies including well timbers and sleepers for construction of Trans-Australian Railway 1914–17. Photo: Australian National Railways Commission, National Library of Australia, Bib ID 3513248.