Railways and Tramways of Australia
25 October
VLocity train led by car 1243 approaching Lara station with a South Geelong service, 22 December 2015. Photo: David Matheson.

Going faster in Victoria
Victoria’s Regional Fast Rail (RFR) project officially commenced on 25 October 2002.
Following the state election in October 1999 the new government followed up on its promises for faster train services on the Geelong, Ballarat, Bendigo and Traralgon lines. Feasibility studies were undertaken and details of the RFR project were announced in September 2000.
The RFR Project featured five overall components: upgraded rail infrastructure; faster trains; a fibre optic cable network to facilitate upgraded signalling; a new timetable; and improved connecting regional bus services.
Track upgrades included over 500 kilometres of railway, enabling trains to operate at speeds up to 160 km/h. An eight-kilometre deviation bypassed a slow section of track on the Ballarat Line. The section between Kyneton and Bendigo was reduced to single-track. New VLocity Diesel Multiple Unit trains were ordered to operate fast train services. Signalling upgrades provided the capability for faster train operations. New timetables increased the frequency of services.
Premier Steve Bracks turned the first sod at Bacchus Marsh on 25 October 2002. Deputy Premier John Thwaites was in Geelong on the same day announcing work to be undertaken on the Geelong Line, while Minister for State and Regional Development John Brumby made a similar announcement in Bendigo. Work commenced on the Geelong and Traralgon lines in 2003, and on the Bendigo and Ballarat lines in 2005.
VLocity trains were first introduced on the Ballarat Line in December 2005. A full RFR timetable commenced on the Geelong, Ballarat and Bendigo lines on 3 September 2006 and on the Traralgon Line on 15 October 2006. Journey times were reduced on all lines, although not by as much as originally announced. Passenger numbers subsequently increased significantly.
The RFR brought faster travel to Victoria’s major regional lines.
Bibliography
Auditor General, Victoria, Results of special audits and other investigations, Victorian Government Printer, Melbourne, 2006.
‘Fast rail project’, Newsrail, vol. 30, no. 12, December 2002, p 366.
‘Gippsland RFR timetable starts’, Railway Digest, vol. 44, no. 12, December 2006, p 16.
M Simister, ‘Victoria travels with VLocity’, Railway Digest, vol. 44, no. 10, October 2006, pp 28–37.
‘Victoria’s Regional Fast Rail Project’, Transit Australia, vol. 59, no. 6, June 2004, pp 167–73.
‘World class infrastructure and modern rail services for regional Victoria’, Railway Digest, vol. 43, no. 2, February 2005, pp 18–23.
VLocity trains with DM(D)1154 trailing (left) and DM(D)1102 leading (right), Footscray, 18 December 2017. Photo: David Matheson.


DM1230 leading a westbound VLocity train passing Sunshine Station, 8 March 2026. Photo: David Matheson.